our achievements

2025

Moved the Cables Business under a wholly owned subsidiary


Expanded global manufacturing capacity to 4,68,200 MTPA


Commenced manufacturing of aluminium conductors at the Vadodara cables facility


Entered the Ropeway Business with first project secured

2024

Unveiled Purpose: “We Transform Lives by Building Sustainable World class Infrastructure”.

2023

Expanded Civil portfolio with a breakthrough order for a multi‑specialty hospital in Eastern India


Strengthened Railway portfolio with new signalling and OHE speed upgrade orders


Expanded and diversified tower sales business globally

2022

Entered Digital GIS Substations and HVDC terminal stations in T&D

 

Expanded Civil portfolio into commercial buildings, logistics, and paints

 

Advanced Metro Electrification with OHE, Third Rail, and ballastless track works

 

Forayed into KAVACH (Train Collision Avoidance System) and Automatic Block Signalling in Railways

 

Developed ten new cable products; forayed into station work development in Oil & Gas

2021

Acquired Spur Infrastructure, strengthening Oil & Gas Pipelines Business

2020

Forayed into Oil & Gas Pipelines Business

 

Acquired Dubai tower manufacturing facility

2017

KEC expands its business portfolio to include Smart Infrastructure with a focus on Smart Cities & Communication, Smart Mobility and Smart Utility.

2016

Pioneered the use of Covered Conductor Technology for a project in Bengaluru.In line with the Company's vision, KEC expands its business portfolio to include Civil Construction with a focus on Residential buildings, Industrial plants and Commercial complexes.First Indian EPC Company to receive the latest 2015 International Standard IMS Certification covering all our EPC BU works, encompassing a large scope in India and 30+ countries that we operate in.Successfully installed 35 MW of projects with the single axis tracker technology, probably the largest in the country

2015

First 765 kV GIS Substation in Thiruvalam, which is also a first-of-its-kind in South India.

2014

Executed one of the most prestigious river crossing projects in West Bengal involving tower construction in mid river and along the shore. A first of its kind in India, the total height of individual River Crossing (RC) tower structure is ~236 meters (775 feet). This is about 75% of the height of Eiffel Tower. The weight of each RC tower is ~1790 MTs.
Secured first turnkey order in Solar space.

2012

Established a world-class greenfield facility at Vadodara, Gujarat for Manufacturing of high tension (HT) and extra high voltage (EHV) power cables.

2011

Forays into Water EPC Business.

2010

Acquired SAE towers in the Americas.
Acquired and merged RPG Cables.
World’s Highest capacity (1,200 kV) tower testing station started at Nagpur, India and tested first 1200 kV tower.

2009

Railway SBU started.

2007

RPG Transmission and NITEL merged. Telecom, Distribution SBU started.

1999

First 765 kV transmission project.

1982

Taken over by RPG Group.

1968

First international turnkey transmission project in Sudan.

1961

First Indian company to get a Railway Electrification order.

1960

First export tower supply export order from New Zealand.

1959

First 220 kV turnkey transmission line project in India.

1950

First tower supply order for Bhakra Nangal Project, India.

1945

 Incorporated as a Power Transmission EPC Company